We want our production lines to run 24x7. But the reality is that it can go idle for reasons that used to be outside the control of our planners. With live visibility from OpsVeda our planners are able to foresee some of those idle time instances and issue the necessary guidance to the supplying warehouse as well as the production floor. So, the reasons that were beyond their control are well within their control now!
Amit Garg
Global Director— IT Business Applications
Reduced production idle time (that previously resulted from raw material warehouse dispatch issue) by over 50%.